CORPUS CHRISTI, TX – Street closures along the City’s significant streets impacting motorists and pedestrians are shown below. These closures may well be owing to development, special event action, or upkeep. All closures are issue to adjust due to weather, crisis perform, or other situation.

Perform zone protection is a precedence. Motorists are advised to gradual down, stick to posted pace boundaries, spend attention, view out for workers, obey symptoms and flaggers and allow more vacation time for delays.

Metropolis Avenue RECONSTRUCTION OR Upkeep Projects

Airline Road – South Padre Island Travel to McArdle Street (Bond 2018)

Through Section 2 of the Airline Road venture, in between South Padre Island Travel and McArdle Street, targeted visitors is shifted to the west side of the roadway (southbound lanes) together Airline Road. Visitors is lessened to one particular lane, in each path, inside of the construction limitations. All through this stage, the next website traffic modifications and lane closures are executed:

    &#13

  • Remaining turns are restricted from Airline Street (southbound) onto McArdle Highway (westbound).
  • &#13

  • The correct lane (northbound via lane) will be closed at the intersection of Airline Street and South Padre Island Drive (SPID). Through visitors will be merged into a one lane. The left-transform lane and right-transform lane at the SPID intersection will stay open.
  • &#13

  • The remaining lane (southbound via lane) will be shut at the intersection of Airline Highway and McArdle Road. Thru site visitors will be merged into the ideal lane. The left-switch lane and the free of charge suitable-change at the McArdle Road intersection will remain open.
  • &#13

  • The right lane alongside McArdle Road (eastbound direction) will be closed at the intersection of Airline Highway and McArdle Highway. Via visitors will be merged into a single lane. The remaining-transform lane will stay open.
  • &#13

  • The shared remaining/thru lane together the South Padre Island Generate frontage street (eastbound direction) will be shut at the intersection of Airline Highway. Via traffic will be merged into the shared through/ideal lane.
  • &#13

  • Driveway openings are provided for organization accessibility inside of the job restrictions. Obtain is minimal to correct-in/correct-out only.
  • &#13

  • Sidewalks will be closed alongside the west facet of Airline Road between McArdle Highway and South Padre Island Generate.
  • &#13

Ayers Avenue Pedestrian Advancement and Flip Lane – South Padre Island Push (SPID) to Gollihar Street (Bond 2014)

During this section, the subsequent site visitors variations and lane closures are applied:

    &#13

  • Northbound Ayers Avenue is closed at the Crosstown/SPID Interchange (frontage highway) intersection. Via website traffic is encouraged to look for alternate routes to access corporations in the spot.
  • &#13

  • Ayers Road is also minimized to one particular lane, just one-way visitors from Gollihar Highway to SPID (southbound course only).
  • &#13

  • Johanna Avenue to Crosstown/SPID Interchange (Northbound) – The outdoors through lane on Ayers Road is intently approaching the Crosstown/SPID interchange. This lane closure will go on by way of the underpass of SPID. This closure will not impression obtain to the eastbound frontage highway of SPID.
  • &#13

  • Johanna Avenue to Crosstown/SPID Interchange (Southbound) – The remaining-change lane and median openings are shut.
  • &#13

  • Crosstown/SPID Interchange & Ayers Street Intersection (Northbound) – Northbound Ayers Street is Closed at the Crosstown/SPID Interchange intersection. Motorists need to use alternate detour routes these as the SH 286 northbound frontage road, Gollihar Road, Kostoryz Highway, or McArdle Highway to access neighborhood corporations.
  • &#13

  • Crosstown/SPID Interchange to Gollihar Road – Ayers Road is lessened to one lane, just one-way targeted traffic flow in the southbound path only. Access to all regional corporations is furnished.
  • &#13

  • Ayers Avenue and Gollihar Highway Intersection – The outdoors via lane on Ayers Street, in the southbound path only, is intently approaching the Gollihar Road intersection. 
  • &#13

  • SH 358 Frontage Highway (Eastbound) – The shared through remaining-flip lane is closed.
  • &#13

RTA bus stops are closed from Gollihar Road to SPID. Bus stops continue being open up at the Port Ayers Transfer Station.

Delgado Avenue – Salazar Avenue to Castenon Road (Residential Avenue Rebuild Plan)

Starting Wednesday, September 8, Delgado Avenue, between Salazar Street and the Lifeless Finish, is shut for reconstruction. The contractor will provide neighborhood entry only to inhabitants alongside Delgado Street. 

Denver Avenue – Doddridge Street to Jackson Location (Household Avenue Rebuild Plan)

Starting Tuesday, September 7, Denver Avenue, concerning Doddridge Street and Jackson Location, is closed for reconstruction. The contractor will give nearby accessibility only to people along Denver Avenue.

Holly Street – Crosstown Expressway (SH 286) to Greenwood Push (Bond 2012)

During Stage 1, motorists and pedestrians really should anticipate the adhering to visitors adjustments:

    &#13

  • Holly Highway is lowered to 1 lane, a person-way site visitors in the westbound course (SH 286 to Greenwood Push).
  • &#13

  • The southbound remaining-flip lane on Greenwood Push, at the Holly Road intersection, is shut.
  • &#13

  • The suitable-flip lane, alongside northbound Greenwood Drive, is shut at the Holly Street intersection.
  • &#13

  • The eastbound thru lane, alongside Holly Street, is shut at the Greenwood Drive intersection.
  • &#13

  • Sidewalks in just the construction zone are closed.
  • &#13

Laguna Shores Highway – South Padre Island Generate to Graham Street (Bond 2018)

Laguna Shores Highway, among South Padre Island Drive and Graham Road, is shut for reconstruction. Motorists are encouraged to use Waldron Highway as an alternate route for via site visitors. Entry is provided in just the closed roadway segments to residences and enterprises inside of the operate zone.

Laguna Shores Street – Hustlin’ Hornet Generate to Caribbean Generate (Bond 2018)

Laguna Shores Street, in between Hustlin’ Hornet Drive to Caribbean Drive, is closed for reconstruction. Motorists are encouraged to use Waldron Street as an choice route for through targeted visitors. Obtain is supplied in just the closed roadway segments to residences and firms inside the do the job zone. The pursuing quick-time period closures are in position so the contractor can execute utility perform:

    &#13

  • There is a shorter-time period closure of Laguna Shores Street south of Beasley Street to accomplish utility do the job and stormwater installations.
  • &#13

Laguna Shores Street – Mediterranean Generate to Wyndale Street (Bond 2018)

Laguna Shores Highway, between Mediterranean Generate to Wyndale Road, is closed for reconstruction. Motorists are advised to use Waldron Road as an alternate route for through targeted traffic. Entry is delivered within the shut roadway segments to residences and companies in the get the job done zone.

Leopard Road – Palm Travel to Nueces Bay Boulevard (Bond 2018)

The southern portion of the Leopard Road and Battlin’ Buc Boulevard intersection will be shut briefly. The closure is required to put in new utilities in just the intersection in advance of college starts off. Travel lanes are lowered to one lane, in every route, along the westbound lanes (north side) of Leopard Street concerning Nueces Bay Boulevard and Battlin’ Buc Boulevard. Motorists traveling eastbound alongside Leopard Road are shifted to the westbound lanes (north aspect) at Old Robstown Road. The southern aspect of the Leopard Avenue and Nueces Bay Boulevard intersection remains shut. Nueces Bay Boulevard is also closed to via targeted visitors between Leopard Street and Up River Highway.

Ocean Drive Rehabilitation Venture – Airline Street to Louisiana Avenue

Ocean Push is reduced to a person lane, in each way, on the east aspect of Ocean Travel (northbound lanes) involving Airline Road and Louisiana Avenue.  Entry to houses within just the work zone will be preserved at all moments.

Ohio Avenue – Staples Street Job, Bay Ltd.

Ohio Avenue is shut to through traffic among Staples Street and Swantner Push for sanitary sewer utility design. Access to properties in just the work zone will be managed at all periods.

Park Street 22 Bridge and Channel – Whitecap Boulevard to Commodores Drive (SH 361)

Section 1 of the Park Road 22 Bridge and Channel task is underway on the east side (northbound lanes) of Park Road 22. Motorists traveling northbound alongside Park Street 22 are shifted to the southbound lanes (west facet) among Cruiser Avenue and Compass Avenue. Travel lanes are diminished to one particular lane, in each and every course, along the southbound lanes (west aspect) concerning Cruiser Street and Compass Street.

Six Factors Intersection – Road and Signal Improvements (Bond 2018)

Throughout Period 4 of the job, motorists and pedestrians really should assume to see the following lane closures and visitors adjustments:

    &#13

  • South Staples Road, in the southbound course, will be lowered to a person lane from Booty Street to South Alameda Street.
  • &#13

  • The “Right Only” travel lane alongside South Staples Road, involving South Alameda Avenue and the Six Position Intersection, will be reopened to make it possible for access onto Ayers Street.
  • &#13

  • The outside through lane together South Staples Road, between South Alameda Avenue and the 6 Stage Intersection, will be reopened to allow for southbound through actions on to Staples Avenue and Alameda Road.
  • &#13

  • The east side (northbound lanes) of Staples Avenue will be shut at the intersection of Ayers Road.
  • &#13

  • Ayers Avenue will be shut, in the westbound route, involving 7th Road and the Six Factors intersection. Westbound site visitors will be detoured at 7th Avenue.
  • &#13

  • The still left lane will be shut along Alameda Road, in the northbound direction, involving Palmero Road and the Six Details Intersection. Via website traffic will be shifted to the west facet (southbound lane) of Alameda Avenue approaching the Six Points intersection and proceed this movement through the intersection.
  • &#13

  • The appropriate lane will be closed along South Staples Road between 10th Street and the Six Factors intersection.
  • &#13

  • 10th Road, in between Ayers Road and South Staples Avenue, has been reconstructed, and targeted traffic will flow has been changed to 1-WAY in the southbound course (Ayers Street to South Staples Road).
  • &#13

  • Sidewalks will be shut within just the perform zone.
  • &#13

Staples Avenue – Baldwin Boulevard to Kostoryz Street (Bond 2018)

Throughout Section 1 of design on Staples Avenue, among Baldwin Boulevard and Kostoryz Highway, motorists and pedestrians ought to count on the adhering to targeted visitors changes:

    &#13

  • The northbound lanes and heart convert lane (east facet) of Staples Street, involving Baldwin Boulevard and Kostoryz Highway, will be closed for design. Visitors will be shifted to the west side of Staples Street (southbound lanes) and decreased to just one lane in every course.
  • &#13

  • Site visitors together northbound Staples Avenue will be shifted to the west side (southbound lanes) of the roadway approaching the Kostoryz Highway intersection.
  • &#13

  • The inside still left-turn lane will be shut together Kostoryz Street at the Staples Street intersection.
  • &#13

  • The intersection of Louisiana Avenue and Kosar Road with Staples Avenue, on the east side, is shut to set up storm h2o utilities.
  • &#13

  • Sidewalks will be shut on the east facet of Staples Road, in the construction zone.
  • &#13

Staples Avenue – South Padre Island to Lansdown Push (Bay Ltd.)

A Town Contractor is executing mill and overlay operations on Staples Road amongst SPID and Lansdown Drive. Motorists ought to anticipate various lane closures. Flaggers will be onsite to assist motorists. Delays are predicted, and motorists are recommended to seek alternate routes to steer clear of delays.

Swantner Travel – Indiana Avenue to Texan Trail (Bond 2018)

Swantner Travel is shut to via targeted traffic concerning Indiana Avenue and Ralston Avenue for reconstruction. Chamberlain Generate is also closed amongst Reid Travel and Swantner Generate. Accessibility to neighborhood citizens is provided.

Metropolis PERMITTED CLOSURES

Greenwood – Gavilan Avenue to Days Conclude Drive (B. Robinson, Spectrum)

Contractors for Spectrum are implementing daily correct lane closures alongside with both northbound and southbound instructions of Greenwood Push, involving Gavilan Road and Times Stop Generate, to set up a new underground conduit. This operate is envisioned to last quite a few weeks. 

Harbor Generate – Hamman Excavating

Harbor Push, north of Hirsch Avenue, is quickly closed for reconstruction. Two-way website traffic will be maintained alongside a small segment of Harbor Drive among Hirsch Avenue and the museum parking great deal.

Kostoryz Highway – Saratoga Boulevard to Holly Highway (AEP Texas)

Contractors for AEP Texas are utilizing day by day appropriate lane closures together northbound Kostoryz Street, amongst Saratoga Boulevard and Holly Street, to install new electric power poles and electrical cables. When design progresses to the Holly Highway intersection, contractors will be implementing a daily, ideal lane closure together eastbound Holly Highway and will keep on via the intersection. This do the job is anticipated to final numerous weeks.

Leopard Road – Palm Push to Port Avenue (AT&T)

Leopard Street concerning Palm Push and Port Avenue is decreased to a person lane, in each individual course, together eastbound lanes (south side). The get the job done zone is required to regulate an current vault and paving functions just after the relocation. Lane closures together this stretch of Leopard Road are predicted to past quite a few months.

Martin Road – Dorado Road to Kentucky Derby Generate (Mesa Mechanical)

Contractors for a non-public improvement are carrying out sanitary and storm sewer installations alongside Martin Avenue that will affect visitors movement at the intersection of Dorado Street. This function will also influence visitors move all over the university. The intersection closure is anticipated to very last numerous months. Motorists and pedestrians ought to hope to see the next targeted traffic modifications:

    &#13

  • The intersection of Martin Road and Dorado Avenue will be partly shut. This partial closure will decrease Martin Road to “one-way”, in the southbound route, at the intersection.
  • &#13

  • Northbound Martin Street will be absolutely closed to targeted visitors at Dorado Road. Motorists traveling north on Martin Avenue will be detoured onto Kentucky Derby Push.
  • &#13

  • Two-way visitors, for community accessibility to the college, will be taken care of along Martin Street in between Kentucky Derby Generate and the Los Encino’s Elementary School bus parking large amount.
  • &#13

  • Dorado Road will be closed to thru visitors in between Ventura Lane and Martin Road, in the eastbound direction only. Motorists traveling eastbound on Dorado Avenue will be detoured on to Ventura Lane and Carolyn Drive to access Martin Avenue.
  • &#13

  • Motorists will be authorized to convert left (in the westbound path) when exiting the college driveway positioned on Dorado Avenue.
  • &#13

  • Sidewalks will be shut within just the work zone.
  • &#13

McArdle Street – Ennis Joslin Road to Nile Generate (AEP Texas)

Contractors for AEP Texas are applying day by day closures and targeted traffic shifts into the centre change lane, along westbound McArdle Road among Ennis Joslin Highway and Nile Push. Lane closures are remaining carried out to set up new power poles and electrical cables alongside the north side of McArdle Road. This work is anticipated to final several months.

Mexico Avenue/Mestina Avenue – Leopard Avenue to Lipan Avenue (Guerra Underground Development)

Mexico Street involving Leopard Street and Lipan Road is shut to replace a sanitary sewer line for the Town of Corpus Christi as aspect of Harbor Bridge building. Westbound Mestina Street is closed to through visitors at Josephine Street. Nearby entry is supplied to people. This avenue closure is envisioned to final various months.

Staples Avenue – Hayward Drive to Barracuda Location (AEP Texas)

Contractors for AEP Texas are applying each day ideal lane closures together southbound Staples Road, involving Hayward Push and Barracuda Spot, to put in new fiber optic cable on existing energy poles. This operate is expected to final many weeks.

Staples Road – Holly Street to South Padre Island Travel (AEP Texas)

More than the subsequent many months, an AEP Texas contractor will be setting up new underground electrical circuits alongside Staples Street from Burnham Drive to South Padre Island Push. Get the job done will be executed at night time. Nightly lane closures will start off immediately at 8:30 p.m. and end at 5:30 a.m. For the duration of nightly closures and above the course of the challenge, motorists ought to anticipate the pursuing targeted visitors changes:

    &#13

  • Staples Avenue will be reduced to just one lane in the northbound way.
  • &#13

  • Closures of the center-transform lane at active perform zone locations.
  • &#13

  • Still left-flip constraints on side streets inside energetic function zone areas.
  • &#13

  • Closures of the heart and westbound journey lane along McArdle Street, amongst Lum Road and Salem Travel.
  • &#13

Motorists touring via the spot must use warning, stick to posted velocity limits, and fork out notice to employees and operate automobiles going in and out of the operate zone.

Timbergate Drive – Staples Road to Spanish Wood Drive (Tri-Star Utilities)

Starting Tuesday, September 7, each travel instructions on Timbergate Travel will be lessened to just one lane each day. Flaggers will support visitors with navigating close to the get the job done space. The work zone is necessary to study the depth to an existing storm line. Lane closures along this extend of Timbergate Drive are predicted to final several days.

Waldron Street – At Graham Road Intersection (South Texas Soil Solutions)

Beginning Tuesday, September 7, Waldron Highway will be minimized to 1 lane, in the northbound way, at the intersection of Graham Road. Graham Road is also staying lessened to a single lane, with a flagging procedure. The function zone is essential to build new driveways. Lane closures together this stretch of Waldron Street and Graham Street are expected to last many times.

Additional Resources